Landeshauptstadt Schwerin - Fachgruppe Wasser- und Bodenschutz
Your responsible office
Landeshauptstadt Schwerin - Fachgruppe Wasser- und Bodenschutz
Am Packhof 2-6
19053
Schwerin, Landeshauptstadt
Staff members
Transport connection
Haltestelle Stadthaus
Tramway:
2
Schwerin Hauptbahnhof
Regional Train:
Intercity
Haltestelle Hauptbahnhof
Bus:
5, 7, 8, 10, 11, 12, 14, 19 (nur zeitweise)
Tramway:
1, 4
Parking spaces
Parking spaces
Tiefgarage Stadthaus
Quantity: 123
With costs
Stellplätze vor dem Stadthaus Am Packhof 2-6
Quantity: 30
With costs
Handicapped parking spaces
Stellplätze vor dem Stadthaus Am Packhof 2-6
Quantity: 2
Free of charge
Tiefgarage Stadthaus
Quantity: 4
With costs
Accessibility
Wheelchair accessible:
No
Lift available:
No
Public services
18 services
2 online
-
Water users who are permitted to discharge large quantities of wastewater must appoint a water protection officer.
-
Do you discharge wastewater into a body of water? Then you must pay a levy to the respective federal state. You should submit the declarations (forms) required for the assessment of the levy to the competent authority.
-
If you are planning a deep borehole or a geothermal exploration for geothermal use with a vertical geothermal probe, you will need permission from your local water authority.
-
Do you want to carry out drilling or other earthworks that could affect the movement or quality of the groundwater? Then you must notify the competent authority in advance.
-
Have you accidentally discovered groundwater while drilling? Then you must inform the competent authority, regardless of whether you reported the well in advance or not.
-
Floods are a danger to people and the environment.
-
If you wish to extract groundwater, you can apply for a permit under water law from the relevant water authority.
-
A suitability assessment is required for construction products or systems that do not have a general building authority approval, are not included in the building regulations lis...
-
In M-V, waterways other than federal waterways may predominantly only be navigated with motor-powered watercraft. In most cases, motor vehicles may only be used on non-navigable waterways with a permit from the water authorities.
-
Watercourse development is the construction, removal, and substantial alteration of watercourses or their banks.
-
If you extract water directly from groundwater or surface waters (not coastal waters), you may be liable to pay a water abstraction charge.
-
If you wish to discharge commercial/industrial wastewater into a private wastewater system or sewer system, you generally require a permit.
-
If you wish to discharge commercial/industrial wastewater into a public wastewater system or sewer system, you generally require a permit.
-
If you want to discharge wastewater into a private wastewater system, you can be exempted from the permit requirement under certain conditions.
-
Wastewater disposal includes the collection, transportation, treatment, discharge, seepage, sprinkling and irrigation of wastewater (wastewater, rainwater) as well as the...
-
Do you want to construct, operate or significantly modify a wastewater treatment plant? Then this project is subject to approval under certain conditions.
-
According to Article 8 of the Water Framework Directive (WFD) and other reporting requirements, investigation and measurement programs must be implemented for the monitoring of...
-
In order to protect drinking water extraction plants and their catchment areas from adverse effects, water protection areas can be established. Within these areas, certain action...